Construction of « LGV Sud Europe Atlantique » (SEA)
                        Project
                    
                    - Location
 - Tours-Bordeaux, France
 
- Type
 - Track Construction
 
Construction of a 340 km High Speed Line
- 340 km of new railway network (302 km high speed railway and 38 km of junction to existing network)
 - 15 Lots TOARC for infrastructure and two precast sites for superstructures
 
Start date : 2012
End date : 2018
Client : LISEA
            The key figures
                
 of the project            
            
                        69,8 million m3
excavations including 8,9 million m3 of rock material
                                    excavations including 8,9 million m3 of rock material
                        275 000 m3
of soil stabilisation
                                    of soil stabilisation
                        1 360 km
of rails
                            of rails
                        Challenges
                    
                    - 69,8 million m3 excavations including 8,9 million m3 of rock material
 - 275 000 m3 of soil stabilisation
 - 412 structures + 19 viaducts(798 000 m3 reinforced concrete and 100 000 tons of steel)
 - 13 000 catenary poles – 1 360 km of rails
 - 3,3 million tons of ballast
 